Don't offhand see anything wrong with power district two. But the lower turnout in power district 3 is gapped wrong. Not the + signs are opposite sides of the two tracks coming down to it. Those tracks (above the turnout as drawn) need both rails gapped at the turnout. No gaps are needed in the single track coming off the bottom of the turnout.