Non-terminal snubbers

 

I am building a layout with 4 Power Districts. Three PDs have the power supply located at their midpoint and have two track bus that are each less than 30 feet long. It would be helpful to have the fourth district have the power supply offset, producing a 20 foot bus and a 38 foot bus. All of the track bus will have terminal snubbers and twisted (3/foot) wires. Would it help to put a snubber midway on the 38 foot bus?
Thanks,
Michael

Join w4dccqa@groups.io to automatically receive all group messages.