Re: Pinning, Screwing or Nailing Down a Helix?
Timothy Holmes
great timing on this thread. I am going to be starting a helix in a few weeks (money dependant) - I am in N scale, and will be using 12 - 14 inch radius. It will be built on 1/2 inch plywood, 2 1/2 inch spacing between levels, I'll be either feeding each joiner or soldering all the joints, (not sure yet, advice wanted) and im wondering how best to secure the track to the plywood. It shouldnt change dimensions much being plywood, im using Microengineering code 55 flex track Thanks TIM
On Sun, Jun 10, 2018 at 11:29 AM Mark Cartwright via Groups.Io <marcdecapri=yahoo.com@groups.io> wrote:
--
Tim San Luis and Rio Grande
|
|