Re: weekend anteena project


Andy
 

Good luck with your experimenting, and hope it turns out well!

Also if I go insultaed, I was all but the driven elament insulated right?
Maybe the opposite. What I usually see is that only the driven
element needs to be insulated from the boom. And depending on the
feed method, it sometimes can be connected to the boom too.

The reflector and directors are usually connected to the boom. They
could be insulated if that works out best for mechanical reasons, but
there is no reason to insulate them.

Andy

Join Work-Sat@groups.io to automatically receive all group messages.