Bonjour a tous,
This is a B060 SN scope, GPIB and CTT/WR options,
From epay as "defective power, works otherwise". It arrives with every cable disconnected from the power supply, and the supply completely blown.
I have removed the PSU and still working to fix or replace it. GPIB option was also removed, #671-0981-03
Question is how to replug all the option cables ?
Service manual and options manuals do not seem to have the exact cable configuration, in schematics or assembly diagrams,
IF anyone has the OPT 09 plus 10 configuration, I would appreciate photos of the cable/plugs on the PSU and GPIB board, to back panel and elsewhere.
Mille mercis pour votre aide gentil!
Many thanks for your kind assistance!
Jon .