Finished the electrical in the building including 18 outlets in the ceiling for RR lighting.
maybe about 1/4 done with the insulation.
Have had three major 1" an hour rains and no leaks dso everything is looking good.
Sheet rock next.
-Steve

Steve Hatch
 

the new additIon has space for the operators to get around

 

It should be morphed to fit as I build it.
   Or changed as the need arises.
-Steve Hatch