Re: Subrx availability?


Eric Swartz - WA6HHQ, Elecraft
 

The 2nd RX should ship 30-45 days after the first K3s begin shipping.
It was the last item to leave engineering and the pipeline of parts
and PCBs takes time to arrive here. Plus we have a lot of items to
build, test and ship.

We're pretty busy these days, as you might expect, so I can';t post
here often. I'll try to stop by from time to time though!

73, Eric WA6HHQ

--- In Elecraft_K3@..., "N1EU" <barry.n1eu@...> wrote:

Has anyone heard or seen mention of whether the subreceiver
availability will be delayed beyond the first K3 production run?

Tnx/73,
Barry N1EU