Amsterdam show
john valachovic
Mike R. Replied hey run trains, Mike L. Is reputed to be attending, haven't heard from anyone else. Perhaps this show should be a T track show??? Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message -------- From: "geoffdunnsoccer@... [AlbanyNTRAK]" <AlbanyNTRAK@...> Date: 03/24/2016 8:02 PM (GMT-05:00) To: AlbanyNTRAK@... Subject: [AlbanyNTRAK] DCC system We had a problem with the DCC system at the Polish Community Center last Saturday. Eventually it started working, and then worked consistently the rest of the day. I wish to report that I tightened up a few screws, powered it up, and everything works fine now. I don't know what caused the problem at the show.
|
|
Dave Sefcik
I'll be attending with my two modules. Dave
On Mar 25, 2016, at 9:22 PM, albanymain albanymain@... [AlbanyNTRAK] <AlbanyNTRAK@...> wrote:
|
|
Rod Mason
I plan on attending with my one module along with my JMRI setup. I can also do TTrak with the same modules that I brought to the PCC show last Saturday if that's what decided. Rod
On Mar 25, 2016, at 9:22 PM, albanymain albanymain@... [AlbanyNTRAK] <AlbanyNTRAK@...> wrote:
|
|
Robert Gatland <rgatland@...>
I can’t go to the Amsterdam show.
Bob G.
|
|
lacasse
I do plan to attend, I can bring either 10’ or 20’ of yard or corners. If
we decide to do T-Trak I could supply modules as well but not both, Mike L.
From: mailto:AlbanyNTRAK@...
Sent: Friday, March 25, 2016 9:22 PM
Subject: [AlbanyNTRAK] Amsterdam show
Mike R. Replied hey run trains, Mike L. Is reputed to be attending,
haven't heard from anyone else. Perhaps this show should be a T track
show???
Sent from my Verizon Wireless 4G LTE
smartphone
-------- Original message -------- From: "geoffdunnsoccer@... [AlbanyNTRAK]" Date: 03/24/2016 8:02 PM (GMT-05:00) To: AlbanyNTRAK@... Subject: [AlbanyNTRAK] DCC system We had a problem with the DCC system at the Polish Community Center last
Saturday. Eventually it started working, and then worked consistently the
rest of the day. I wish to report that I tightened up a few screws,
powered it up, and everything works fine now. I don't know what caused the
problem at the show.
|
|
john valachovic
So where we are is we need a coordinator for the show. That person needs to decide what the layout is going to be. Sent from my Verizon Wireless 4G LTE smartphone
-------- Original message -------- From: "'Mike & Linda LaCasse' lacasse@... [AlbanyNTRAK]" <AlbanyNTRAK@...> Date: 03/26/2016 5:23 PM (GMT-05:00) To: AlbanyNTRAK@... Subject: Re: [AlbanyNTRAK] Amsterdam show
I do plan to attend, I can bring either 10’ or 20’ of yard or corners. If
we decide to do T-Trak I could supply modules as well but not both, Mike L.
From: mailto:AlbanyNTRAK@...
Sent: Friday, March 25, 2016 9:22 PM
Subject: [AlbanyNTRAK] Amsterdam show
Mike R. Replied hey run trains, Mike L. Is reputed to be attending,
haven't heard from anyone else. Perhaps this show should be a T track
show???
Sent from my Verizon Wireless 4G LTE
smartphone -------- Original message -------- From: "geoffdunnsoccer@... [AlbanyNTRAK]" <AlbanyNTRAK@...> Date: 03/24/2016 8:02 PM (GMT-05:00) To: AlbanyNTRAK@... Subject: [AlbanyNTRAK] DCC system We had a problem with the DCC system at the Polish Community Center last
Saturday. Eventually it started working, and then worked consistently the
rest of the day. I wish to report that I tightened up a few screws,
powered it up, and everything works fine now. I don't know what caused the
problem at the show.
|
|
Geoff Dunn
I have told John this. I will be setting up with the Free-mo group. But I reserved space for Albany NTrak, as requested. I will bring the Albany NTrak DC and DCC setups, and the duckunder module. I could fit my 3' minimal corners in the car as well, if needed. But others will have to take care of setting these up.
Geoff
|
|
lacasse
Will we have enough modules to do an N-Trak layout? I can bring a 4’ and a
3’ corner, but if I do I am not sure I can fit any of the yard. If I bring two
corners can someone else bring two more corners to make a complete layout? Or
should we go ahead and plan a T=Trak layout. If we go T-Trak then we need to let
Matt know we will need tables. I have a couple 6’ I can bring. Mike L.
From: mailto:AlbanyNTRAK@...
Sent: Sunday, March 27, 2016 3:22 PM
To: AlbanyNTRAK@...
Subject: Re: [AlbanyNTRAK] Amsterdam show I have told John this. I will be setting up with the Free-mo
group. But I reserved space for Albany NTrak, as requested. I will
bring the Albany NTrak DC and DCC setups, and the duckunder module. I
could fit my 3' minimal corners in the car as well, if needed. But others
will have to take care of setting these up.
|
|
Geoff Dunn
To answer Mike's question about having a layout - my memory says Dave is bringing 8', Rod is bringing 4', and the duckunder will be there. If Mike L brings his corners (and the cube), and someone gets the 2' corners from Brian, OR Mike R. brings Ed's 3' corners, OR I bring my 3' corners, then yes, there are enough modules for a layout. Some temporary legs might be needed because some of the corners only have one leg and the duckunder has none. But a 7' X 15' layout with a very narrow pit could be set up with the modules that people have committed so far. If Mike brings 10' of yard, it could be bigger and wider.
Geoff
|
|
Michael Romanowski
I had only planned to be there for a couple of hours with my grandson. Eds corners are very heavy. We have asked him for permission to redo them to make them lighter but he has refused.
On Mar 28, 2016, at 7:43 AM, geoffdunnsoccer@... [AlbanyNTRAK] <AlbanyNTRAK@...> wrote:
|
|
Dave Sefcik
Correct, I would be bringing my 8' of N Trak switching modules. It'll be more good practice for the September NE NMRA event. I'm really not interested in bringing T Trak modules. Dave
On Mon, Mar 28, 2016 at 7:43 AM, geoffdunnsoccer@... [AlbanyNTRAK] <AlbanyNTRAK@...> wrote:
--
Dave Sefcik Broker Associate Piretti Real Estate 22 Walker Street Lenox MA 01240 413-822-8525 (cell) 413-637-1696 (offfice) "E-mails sent or received shall neither constitute acceptance of conducting transactions via electronic means nor create a binding contract until and unless a written contract is signed by the parties."
|
|
Rod Mason
As I indicated in my message from last Saturday, I will be bringing my 4' module. Like Dave, I'm really not interested in doing a TTrak setup, especially if we have to provide our own tables. Rod
On Mar 28, 2016, at 7:43 AM, geoffdunnsoccer@... [AlbanyNTRAK] <AlbanyNTRAK@...> wrote:
|
|
lacasse
Ok, With your 12’ of modules and the duckunder from Geoff and my two
corners and cube, we are almost there in assembling an N-Trak layout. Any
suggestions for the the two corners we will need? And is anyone else planning to
bring modules? Mike
From: mailto:AlbanyNTRAK@...
Sent: Tuesday, March 29, 2016 5:03 AM
To: AlbanyNTRAK@...
Subject: Re: [AlbanyNTRAK] Amsterdam show
As I indicated in my message from last Saturday, I will be bringing my 4'
module. Like Dave, I'm really not interested in doing a TTrak setup,
especially if we have to provide our own tables.
Rod
On Mar 28, 2016, at 7:43 AM, geoffdunnsoccer@...
[AlbanyNTRAK] <AlbanyNTRAK@...>
wrote:
|
|
Doug Dederick
I am not coming but I have one of the 3 ft club corners if someone wants take it.
toggle quoted messageShow quoted text
|
|