New file uploaded to AlbanyNTRAK
Hello,
This email message is a notification to let you know that
a file has been uploaded to the Files area of the AlbanyNTRAK
group.
File : /NTRAK Corner-junction.jpg
Uploaded by :
Hello,
This email message is a notification to let you know that
a file has been uploaded to the Files area of the AlbanyNTRAK
group.
File : /NTRAK Corner-junction.jpg
Uploaded by :
|
By
AlbanyNTRAK@...
·
#30
·
|
|
Ideas for the new corners
I have drawn up a design in AutoCAD showing an idea for the track
plan. It is posted in the files section. This will also give everyone
an idea of what can be done with layout design if everyones
I have drawn up a design in AutoCAD showing an idea for the track
plan. It is posted in the files section. This will also give everyone
an idea of what can be done with layout design if everyones
|
By
john valachovic
·
#29
·
|
|
Re: corner modules
Mark,
I think that that is a great idea. It would also demonstrate to the
public that T-Trak is designed to "just sit on top of a table" rather
than require any special legs or capentry or what have
Mark,
I think that that is a great idea. It would also demonstrate to the
public that T-Trak is designed to "just sit on top of a table" rather
than require any special legs or capentry or what have
|
By
nycrr8
·
#28
·
|
|
Re: corner modules
Maybe a fifth cirner module would be called for.
I don't remember the exact configuration, but I think that Mike LaCasse
has brought a two piece junction. 1 piece was the corner and the
second piece
Maybe a fifth cirner module would be called for.
I don't remember the exact configuration, but I think that Mike LaCasse
has brought a two piece junction. 1 piece was the corner and the
second piece
|
By
nycrr8
·
#26
·
|
|
Re: corner modules
Maybe we could develop some sort of leg extensions for a "banquet" table sothat a standard folding table could be raised to the necessary height andleveled?
Maybe we could develop some sort of leg extensions for a "banquet" table sothat a standard folding table could be raised to the necessary height andleveled?
|
By
Mark Fleischhauer
·
#27
·
|
|
Re: corner modules
The junction modules would have the orange line break away not he red,
so this would still allow the four track main.
Geoff if a base was made for the t-trak modules to sit on instead a
banquet table
The junction modules would have the orange line break away not he red,
so this would still allow the four track main.
Geoff if a base was made for the t-trak modules to sit on instead a
banquet table
|
By
john valachovic
·
#25
·
|
|
Re: corner modules
I like the idea of the option of bend track but if it is going to
cause a 'standards' issue I would like to see more info on the
subject. A quick check on the Bend Track site shows a straight
junction
I like the idea of the option of bend track but if it is going to
cause a 'standards' issue I would like to see more info on the
subject. A quick check on the Bend Track site shows a straight
junction
|
By
eleser2002 <leser8@...>
·
#24
·
|
|
T-Trak adapter module
I have nearly finished an adapter module that will let us go from the
outer main to T-Trak modules forming a "T" with the main N-Trak
layout. My plan is that it will be reversible, so the T-Trak
I have nearly finished an adapter module that will let us go from the
outer main to T-Trak modules forming a "T" with the main N-Trak
layout. My plan is that it will be reversible, so the T-Trak
|
By
nuddffoeg <nuddffoeg@...>
·
#23
·
|
|
Re: corner modules
My vote would be to NOT make the corners into junctions. Having them
be junctions does two things - it makes them not fit the N-Trak
standard for track radius, and (from what I read in other
My vote would be to NOT make the corners into junctions. Having them
be junctions does two things - it makes them not fit the N-Trak
standard for track radius, and (from what I read in other
|
By
nuddffoeg <nuddffoeg@...>
·
#22
·
|
|
Re: corner modules
Doug,
At Poughkeepsie and Kingston (and maybe other shows, we sometimes ran
a "two track" branch line off one of Mike Lacasse's corner/junction
modules.
At the end of the "two track" branch line was
Doug,
At Poughkeepsie and Kingston (and maybe other shows, we sometimes ran
a "two track" branch line off one of Mike Lacasse's corner/junction
modules.
At the end of the "two track" branch line was
|
By
nycrr8
·
#21
·
|
|
correction
I called them trainsision mods but I ment juction mods it's been a
long day! Thanks Doug
I called them trainsision mods but I ment juction mods it's been a
long day! Thanks Doug
|
By
Doug Dederick
·
#19
·
|
|
supplies for mods
Brain H. has offered to pick up track and wiring for the corner mods.
Thanks Brain. We still need to hear from the group on making the
corner mods capable of being transition corners. Thanks
Brain H. has offered to pick up track and wiring for the corner mods.
Thanks Brain. We still need to hear from the group on making the
corner mods capable of being transition corners. Thanks
|
By
Doug Dederick
·
#18
·
|
|
Re: corner modules
Brain Thank you for helping out and yes we are building two. We may also need 4 rights and 4 left turnouts depending on the group decision on transition capability. Please keep all receipts and
Brain Thank you for helping out and yes we are building two. We may also need 4 rights and 4 left turnouts depending on the group decision on transition capability. Please keep all receipts and
|
By
Doug Dederick
·
#20
·
|
|
Re: corner modules
Doug,
I'll get the track & wire. I picked up five pieces of flex track and cork roadbed at J.P.'s today, and have some speaker wire. Just to confirm how much I'll need to buy, are we making two
Doug,
I'll get the track & wire. I picked up five pieces of flex track and cork roadbed at J.P.'s today, and have some speaker wire. Just to confirm how much I'll need to buy, are we making two
|
By
Joyce <tftr1@...>
·
#17
·
|
|
Corner modules
Hi,
I hope everyone had a nice weekend. John and I drove out to Syracuse
to the train show and had a great day. We were able to check out a
few 3 foot corners other clubs had at the show. We also
Hi,
I hope everyone had a nice weekend. John and I drove out to Syracuse
to the train show and had a great day. We were able to check out a
few 3 foot corners other clubs had at the show. We also
|
By
Doug Dederick
·
#16
·
|
|
Re: Corner module construction
With the mountian division there is a possability of running DCC with out interfering with the blue, yellow, red and orange.
Just food for thought.
Ed
With the mountian division there is a possability of running DCC with out interfering with the blue, yellow, red and orange.
Just food for thought.
Ed
|
By
leser8@...
·
#15
·
|
|
Re: Corner module construction
I think that Ed's suggestion for the mountain division
is an excellent one.
I realize that we have mixed feelings about the
mountain division, but since there are a few members
using it (not me, at
I think that Ed's suggestion for the mountain division
is an excellent one.
I realize that we have mixed feelings about the
mountain division, but since there are a few members
using it (not me, at
|
By
nycrr8
·
#14
·
|
|
New corners
Hi, all.
As for new corners, I feel the four main lines are a "must have". The mountain division would be a nice addition, as there are a couple of members who would want it and it would give us the
Hi, all.
As for new corners, I feel the four main lines are a "must have". The mountain division would be a nice addition, as there are a couple of members who would want it and it would give us the
|
By
Joyce <tftr1@...>
·
#13
·
|
|
Re: Corner module construction
I like the orange, red, yellow and blue for the fact that we can have
a small double dog bone layout if the end loops are avelable like we
had in Fishkill.
Is the mountian division being considered?
I
I like the orange, red, yellow and blue for the fact that we can have
a small double dog bone layout if the end loops are avelable like we
had in Fishkill.
Is the mountian division being considered?
I
|
By
eleser2002 <leser8@...>
·
#12
·
|
|
Corner module construction
Doug and I are discussing a schedule to construct the modules. We
should start getting an idea of what else is needed to construct the
modules beside lumber and members should start getting together
Doug and I are discussing a schedule to construct the modules. We
should start getting an idea of what else is needed to construct the
modules beside lumber and members should start getting together
|
By
john valachovic
·
#11
·
|